HORIZON FORMWORK CO., LTD.

HORIZON FORMWORK CO., LTD. Professional manufacturer of formwork and scaffolding systems

Manufacturer from China
Site Member
8 Years
Home / Products / Climbing Formwork System /

Crane Lifted Climbing Formwork System , Jump Formwork System Platform Width 70cm

Contact Now
HORIZON FORMWORK CO., LTD.
City:xingtai
Province/State:hebei
Country/Region:china
Contact Person:MrH. Chang
Contact Now

Crane Lifted Climbing Formwork System , Jump Formwork System Platform Width 70cm

Ask Latest Price
Video Channel
Brand Name :HORIZON
Model Number :Climbing bracket CB240
Place of Origin :CHINA
MOQ :100 sets
Price :pls ask HORIZON
Payment Terms :L/C, T/T
Supply Ability :100 tons per week
Delivery Time :20-25 days
Packaging Details :pallets, bundles, bulk
Material :steel square tube, climbing bracket, panel strut
OEM :Available
Colour :yellow & blue
Working platform :2.4m
Climbing style :By crane lifting
Application :for core wall, bridge pier, etc.
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Efficient Climbing Bracket Lifted by Crane with Working Platform Width 70cm

Climbing Formwork CB240 is a crane-dependent climbing system and support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 5.40 m.
Advantages:
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.

1. Climbing bracket

2. Main platform

3. Pouring platform

4. Finishing platform

5. Roll-back system

6. Push-pull prop

7. Vertical waling

8. Anchor system

9. Formwork



Climbing sequence:


Step 1
The first pouring is to be completed by using the proper wall elements and has to be exactly aligned with adjusting struts.


Step 2
The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured.
Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed.


Step 3
After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system.


Step 4
Release and remove bolts that fixing the positioning anchor point.
Loosen and remove tie-rod
Loosen the wedges of the carriage unit.


Step 5
Retract the carriage and lock it with wedge.
Install upper climbing cones
Loosen wind securing device, if any
Remove the lower climbing cone


Step 6
Adjust the carriage into the common center of gravity and lock it again.
Attach the crane sling to the vertical waling.
Remove the security bolts of the bracket.
Lift the climbing bracket by crane and attach it to the next prepared climbing cone.
Insert and lock the security bolts again.
Install the wind-load device, if required.


Step 7
Move the carriage back and lock it by wedge.
Clean the formwork.
Install reinforcement bars.


Step 8
Move the formwork forward until lower end rests against top of the finished section of the wall.
Adjust formwork vertically by means of push-pull brace.
Fix tie-rods for the wall formwork