HORIZON FORMWORK CO., LTD.

HORIZON FORMWORK CO., LTD. Professional manufacturer of formwork and scaffolding systems

Manufacturer from China
Site Member
8 Years
Home / Products / Scaffolding Steel Prop /

Heavy Duty Scaffolding Steel Prop , 30KN Adjustable Support Prop EN1065 Standard

Contact Now
HORIZON FORMWORK CO., LTD.
City:xingtai
Province/State:hebei
Country/Region:china
Contact Person:MrH. Chang
Contact Now

Heavy Duty Scaffolding Steel Prop , 30KN Adjustable Support Prop EN1065 Standard

Ask Latest Price
Brand Name :HORIZON
Model Number :Scaffold Shoring Prop
Certification :SGS
Place of Origin :CHINA
MOQ :2000 pcs
Price :pls ask HORIZON
Payment Terms :L/C, T/T
Supply Ability :20000 pcs per week
Delivery Time :15-25 days
Packaging Details :pallets, bundles, bulk
Material :Q235 steel pipe
OEM :Available
finishing :Electric galvanized
Standard :EN1065
Size :Prop 30-300, prop 30-350
Application :for slab shuttering support
Load capacity :30KN at top height
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Heavy Duty Scaffold Shoring Prop With 30KN as per EN1065 Standard

HORIZON Prop was designed for the shoring of horizontal form work as well as for the various requirements of shoring that may arise on site, however always respect load capacity limitations and assembly instructions.

The high load capability makes HORIZON props the top choice offering reliability and safety for any construction job.

Excellent quality is guaranteed by using high quality of raw materials, the manufacturing process and final treatment applied to the props. All these result in safe and efficient use on sites.

The manufacture of Telescopic Props is certified in accordance with standard EN 1065.

Specification Capacity (KN) Height (mm) Dia (mm) Weight (Kg)
HZP30-300 30 1650-3000 76/63 20.9
HZP30-350 30 1970-3500 76/63 23.0
HZP30-400 30 2210-4000 76/63 25.0
HZP20-300 20 1650-3000 60/48 15.7
HZP20-350 20 1970-3500 60/48 16.6
HZP20-450 20 2460-4500 60/48 28.2
HZP20-500 20 2710-5000 60/48 30.5


Important Instructions:
• Respect the prop spacing in accordance with the project.

• Prop load capacities and engineer’s design must be observed.

• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.

• Check formwork and prop erection before concrete pouring.

• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.

• Avoid the sudden emptying of the concrete bucket onto the formwork.

• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.

• Before starting any dismantling operation, check the state of the props.

• After removal, props should not be irregularly piled up.
Heavy Duty Scaffolding Steel Prop , 30KN Adjustable Support Prop EN1065 Standard

Inquiry Cart 0