HORIZON FORMWORK CO., LTD.

HORIZON FORMWORK CO., LTD. Professional manufacturer of formwork and scaffolding systems

Manufacturer from China
Site Member
8 Years
Home / Products / Scaffolding Steel Prop /

High Loading Capacity Scaffolding Steel Prop Q235 Steel Pipe Zinc Plated Surface

Contact Now
HORIZON FORMWORK CO., LTD.
City:xingtai
Province/State:hebei
Country/Region:china
Contact Person:MrH. Chang
Contact Now

High Loading Capacity Scaffolding Steel Prop Q235 Steel Pipe Zinc Plated Surface

Ask Latest Price
Brand Name :HORIZON
Model Number :Scaffolding Prop
Certification :SGS
Place of Origin :CHINA
MOQ :2000 pcs
Price :pls ask HORIZON
Payment Terms :L/C, T/T
Supply Ability :20000 pcs per week
Delivery Time :15-25 days
Packaging Details :pallets, bundles, bulk
Material :Q235 steel pipe
OEM :Available
finishing :zinc-plate, hdg, painting, powder coating
Standard :EN1065
Size :Prop 30-300
Application :for slab concrete construction
Load capacity :heave duty 30KN
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

High Loading Capacity of Scaffolding Prop for Slab Concrete Construction

HORIZON props are used for the shoring on many building sites and our customers appreciate them for their high efficiency and ease of use.

The high load capability makes HORIZON props the top choice offering reliability and safety for any construction job.

Excellent quality is guaranteed by using high quality of raw materials, the manufacturing process and final treatment applied to the props. All these result in safe and efficient use on sites.

The manufacture of Telescopic Props is certified in accordance with standard EN 1065.

Specification Capacity (KN) Height (mm) Dia (mm) Weight (Kg)
HZP30-300 30 1650-3000 76/63 20.9
HZP30-350 30 1970-3500 76/63 23.0
HZP30-400 30 2210-4000 76/63 25.0
HZP20-300 20 1650-3000 60/48 15.7
HZP20-350 20 1970-3500 60/48 16.6
HZP20-450 20 2460-4500 60/48 28.2
HZP20-500 20 2710-5000 60/48 30.5


Important Instructions:
• Once erection is finished, double-check the props before use.

• Respect the prop spacing in accordance with the project.

• Prop load capacities and engineer’s design must be observed.

• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.

• Check formwork and prop erection before concrete pouring.

• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.

• Avoid the sudden emptying of the concrete bucket onto the formwork.

• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.

• Before starting any dismantling operation, check the state of the props.

• After removal, props should not be irregularly piled up.
High Loading Capacity Scaffolding Steel Prop Q235 Steel Pipe Zinc Plated Surface

Inquiry Cart 0